More information
It became operational in 1976, with a 2WD roller bench and an infrared solar irradiation system. In 2022, it was upgraded with a new generation 4WD roller bench, a new solar irradiation simulation system with full-spectrum lamps, and a new cooling plant. Recently, a 350kW Fastcharge High Voltage system was also implemented for fast charging of electric vehicles